Long-distance triathlon glossary·Base

Aerobic base : Endurance foundation

Load

The low-intensity training phase that builds the capacity to sustain a long effort without burning out.

Aerobic base is built in Z2: long sessions at moderate intensity, conversational pace, stable HR. This phase increases mitochondrial density, improves fat oxidation (better energy efficiency over long distances), and raises the LT1 lactate threshold. In Ironman triathlon, a solid base (CTL 60-80) is essential before adding high-intensity volume, or injury and overtraining risk rises sharply.

In TriPaced:

In TriPaced, the Base phase of your plan concentrates most volume in Z2 (swim, bike, long run). This is also the phase where CTL rises fastest. Z4/Z5 sessions remain a minority during this phase to protect long-term progression.

Related terms

  • TSS : Training Stress Score
  • CTL : Chronic Training Load (fitness)
  • ATL : Acute Training Load (fatigue)
  • TSB : Training Stress Balance (freshness)
  • Sweet spot : the efficiency zone
  • Threshold : the upper sustainable limit